Preventative Maintenance and Cleaning
Preventative Maintenance and Cleaning
Periodic maintenance is essential for safe and proper operation of the Smart Agitation System. Replace worn components immediately.
Component | Inspection Interval | Maintenance / Replacement Schedule |
Paddle | 60-90 Days | Yearly |
Sphere Door Lock | 90-120 Days | Yearly |
Sphere Filter Plate | 60-120 Days | Yearly |
Spin Flow Vibration Tank | 30-60 Days | Yearly |
Dumping and Cleaning:
- Turn off and unplug the unit before cleaning.
- Wipe down the exterior with a damp cloth.
- Do not use harsh chemicals or abrasive materials.
- Close the drain valve and verify the containment cart is in place with the valve closed.
- Press the Auto icon on the touchscreen and select 'Yes' to switch to manual mode.
- In manual mode, press the lower portion of the Agitation tank icon to prompt the door to open.
- Select 'Yes' when prompted to confirm door open action. Allow the biomass to slide into the containment cart.
- Use the integrated sprayer balls to rinse the agitation tank, door, and door seal.
- Close the door and begin the next batch.
- Between Washes: Spray down the walls and floor of the SAS.
- End of Day: Run a cleaning cycle with water and isopropyl alcohol (or ethanol).
- Regular Maintenance: Inspect for wear and replace components as needed.
Inspecting the Unit:
- Regularly check for any signs of wear or damage.
- Ensure all connections are secure.
Storage:
- Store the unit in a cool, dry place when not in use.
Pro Tip:
- If no other processing is scheduled, leave the agitation door open until the next operation.
- Pre-soak material before washing to save time.
- Pre-freeze trays to manage excess freshly washed hash.